Data circuits in Italy
From career access network to EIS service management
In Italy the network that physically connects a site does not always coincide with the operator who sells and manages the service.The carrier wholesale realize or make available the network of access; operators like EIS acquire capacity and collection kits to receive the traffic of the circuits activated on the available networks.
The components of the service
| Component | Role |
|---|---|
| Access network | Connect the customer’s seat to the point of presence of the carrier through fiber, copper or radio |
| Careers | Provides access and delivery of the circuits at the required collection points |
| Collection kit | Interconnection with which EIS receives aggregated circuit traffic |
| EIS Network and Services | Business and operational management, service configuration, monitoring and assistance |
| Hi. | Coverage, order, advancement and management of the circuit life cycle |
Why multiple coverage options are available
The same address can be reached by different careers and technologies. Each combination can change speed, profile, activation time, devices, technical constraints and economic conditions. The coverage verification is used to transform the address into a list of available technologies and offers. Prospects and customers can perform a first verification without authentication from the EIS site; Partners use Hive to access business details and continue with the order.
Public audit
Check online coverage of an address without accessing Hive.
Coverage Guide
Compare the public route with the operating flow reserved for Partners.
From order to active circuit
- normalization of the address and verification of coverage;
- choice of technology, careers and profile;
- collection of technical data and of the contact person in place;
- sending the order and activity of the access carrier;
- delivery on the EIS collection and service configuration;
- testing and switching to the active state.
The presence of commercial coverage does not guarantee the final feasibility on its own.Inspections, infrastructure availability and technical checks can change the outcome or time of the order.